# FCAS Islanding

<Callout icon="📘" theme="info">
  Check out our explainer on FCAS Islanding on the Modo Energy platform here:
  [https://modoenergy.com/research/](https://modoenergy.com/research/fcas-revenues-battery-energy-storage-australia-nem-transmission-constraints-line-outage)
</Callout>

## What is FCAS Islanding?

**FCAS islanding** refers to **price spike events** in specific frequency control ancillary services (FCAS) markets when a region becomes disconnected (or "**islanded**") from the broader NEM grid, or is at risk of this occurring. When a region's ability to import power through **interconnectors** plus available **battery FCAS capacity** falls below critical thresholds, **FCAS prices spike** to incentivise local frequency control resources. Islanding events usually happen in South Australia and Queensland, which are at the edges of the grid.

These events create significant **revenue opportunities** for batteries that can provide **rapid frequency response** during islanding conditions. ![](https://files.readme.io/\[fcas_islanding_diagram].png)

## How do we model it?

The model identifies **islanding conditions** and applies **price spikes** based on real-time grid capacity:

* **FCAS service supply**: Regional import capacities and Battery FCAS supply are monitored in real-time
* **Islanding Detection**: Flag intervals where combined interconnector import capacity + battery FCAS capacity falls below the **state-specific thresholds**
* **Price Spike Application**: Replace base FCAS price forecasts with **spike prices** during detected islanding conditions

<Image align="center" border={false} src="https://files.readme.io/fa661053528d8ac10985a1f57b42e22c0da221c75d08ab54570589667ffd31e4-fcas_islanding_SA_2026-01-02.png" />

## How does this affect prices?

This results in **higher FCAS prices** in both **SA and QLD** as they are both frequently **islanded** from their neighbouring states. However, this is not expected to persist long after **2026**. With more batteries competing for **contingency FCAS markets**, islanding conditions should ease, before disappearing entirely after **interconnector upgrades** such as Project Energy Connect Stage 2.

<Image border={false} src="https://files.readme.io/5b8a5db34bfe34b9090ba3d6375eb0f3fe090ce86a2dca4869dc92bc2d567de3-image.png" />

<br />